Um Kontakt |
Tel: +86 (0)755-8524-1496
Email: info@alcantapcb.com

Starr-Flex-Leiterplatte/

 

 

 

 

 

 

 

 

 

 

em827-s1000-rigid-flex-pcb. em827 and s1000 high multilayer hybrid material pcb. we can make this kinds pcb from 6 Schicht zu 40 layers with higher quality.

 

Layer count —— 18L

Material —— EM827+S1000 + PI

▪ Brettdicke - - - 1.6 ±0.1 mm

▪PI -Dicke — — 0.15 mm

▪ Min. LW/LS —— 0.1/0.1mm

▪ Min. Bohrgröße ——— 0.1 mm

▪ Oberflächenbeschaffung - Rätsel

 

Application fields: mobile phone, image, battery, laptop, display module, electronic medicine, server, e-cigarette and other different fields.

Erhaltene Zertifizierung

Produktzertifizierung: Ul, CQC
Management -System -Zertifizierung: ISO9001, TS16949, TL9000, QC080000, GJB 9001, IS014001, Ohsas18000

Prozessfähigkeit

Die höchste Anzahl herkömmlicher Vorstand (L): 50
Rigid-Flex PCB board the highest level (L): 36
Rigid-Flex PCB board buildup: Erster Ordnung, laminiertes Loch zweiter Ordnung, Loch zweiter Ordnung, Loch dritter Ordnung, vier Ordnung Loch

Material :

FR4: EM827, 370HR, S1000-2, IT180a, EM825Youts, IT158, S1000 / S1155, R1566W, EM285, TU862HF

Hohe Geschwindigkeit:Megtron6, Megtron4, Megtron7, Tu872Slk, FR408HR,N4000-13-Serie, MW4000, MW2000, TU933

Hochfrequenz:RO3003, RO3006, RO4350B, RO4360G2, RO4835, Clte, Genclad, RF35, Fastrise27

Andere:Pp, CVL, EMI, PI, Polyimid, Tk, LCP, Bt, C-Ly, Fradflex, Omega , ZBC2000,

Delivered

Fast board delivery capacity:

Conventional Rigid-Flex PCB board:

4 Lagen 3-4 days delivery
6th floor 5-6 days delivery
8th floor 6-7 days delivery
10 Lagen 7-10 days delivery
12th floor 10-15 days delivery

High-frequency special Rigid-flex board:

4 layers of mixed board delivery as fast as 5~7 days

6-8 layer mixed board delivery as fast as 7~10 days

14 layer mixed board delivery as fast as 15~20 days

26 layer mixed board delivery as fast as 30~35 days

 

Delivery note:

Surface treatment type OSP, nickel-immersion gold, OSP + nickel-nickel alloy, lead-free spray tin, lead spray tin;
Delivery date to confirm the completion of EQ, there are materials in stock;
Mass production delivery days have the difference between the peak season, the off-season delivery period shorter than the peak season;
Special materials, special process delivery cycle, please contact customer service staff;
Beyond the normal delivery cycle needs, please consult customer service.

 

 

Vorher:

Nächste: